Nexans

This project was located outside Charleston, SC achieved the distinction of tallest land-based structure in South Carolina. The scope of work consisted of new construction for a Cable manufacturing facility for EHV (Extreme High Voltage) Cables. This plant was strategically placed along the Cooper River for future manufacturing of underwater transmission cabling. This project was a design-build project with engineering performed in house.